Inspection and maintenance, ranked by risk.
Integrity, corrosion and inspection engineers use it to turn every inspection, reading and work order into a risk-ranked inspection plan and the work orders that carry it out.
Winda Horizon
Today and with Winda
From scattered records to 1 ranked plan.
- Inspection reportUT thickness survey
- Probe readingER probe, inlet loop
- Process dataHistorian, last 30 days
- Work orderOpen work orderInspectApprove
- Inspection reportExternal visual
- Probe readingCoupon, outlet
- Process dataOperating window
- Work orderDeferred inspectionInspectApprove
Winda HorizonRanked work plan
- 01UT thickness scan, inlet loop pipingPhased array UT at 8 locationsThis week
- 02Coupon pull, outlet lineWeight loss coupon and photoIn 2 weeks
- 03Inhibitor residual check, injection pointFluid sample to the labIn 3 weeks
- 04CUI screening, insulated cooler pipingProfile radiographyIn 3 months
- 05Visual survey, flare headerDrone flight over the stackIn 6 months
Sample data
- 01 Today
Inspection intervals set by habitWith Winda HorizonIntervals set by risk and re-ranked every week - 02 Today
Readings reviewed when someone has timeWith Winda HorizonEvery new reading re-checked within hours - 03 Today
Deferrals decided in emailWith Winda HorizonEvery deferral traced to its risk and its approver
How it works
Agents prepare. Engines check. The integrity engineer signs.
- InInspection reports, readings, process data, work orders
- Agents prepareRead every record and draft the plan
- Inspection Data Agent
- Corrosion Rate Agent
- Damage Mechanism Agent
- RBI Agent
- Inspection Planner Agent
- Engines checkRisk and remaining lifeAligned to
- API RP 581
- API 579
- SignsThe integrity engineer
- OutInspection plan and work ordersWork orderProbe replacement
- Asset
- Export line
- Scope
- Retrieve and replace the ER probe in service
- Crew
- Field technician, 1 day
How the work is controlled
- Each agent uses approved tools and this project's data only.
- An independent checker agent re-checks the work.
- Engineering math comes from validated, deterministic engines.
- Every prompt, tool call and output is recorded.
- Agents never approve their own work.
See it run
A new probe reading, from alert to signed plan.
Where it fits
Winda Horizon takes the handover baseline and feeds compliance, insurance and asset strategy.
- DesignEngineering design
- BuildProcurement & bid evaluationConstruction & handover
- OperateHandover baseline, from Construction & handoverOperations & integrityWinda Horizon
- ComplyAudit evidence, to Compliance & auditCompliance & audit
- PlanIntegrity data, to Risk & insuranceRemaining life, to Asset strategyRisk & insuranceAsset strategy
Agents
54 agents in 10 teams, aligned to the standards engineers use.
Each team, with the agents in it. Open a team to see what each agent does.
Corrosion management
8 agents
- Corrosion RateFuses probes, coupons, UT and process data into one current rate per circuit.
- ChemistryRecommends inhibitor, biocide and scale treatment and tracks injection availability.
- Microbial CorrosionReads biological and water-chemistry data to flag microbially influenced corrosion.
- Cathodic ProtectionReads rectifier, test post and survey data and checks protection criteria.
- CUIRanks corrosion under insulation risk and plans the screening.
- Environmental CrackingScreens for sour cracking, HIC and high-temperature hydrogen attack.
- Erosion and SandAssesses sand production and erosion rates.
- External CoatingTracks external coating condition and breakdown risk.
Asset knowledge and risk basis
5 agents
- Asset RegisterBuilds and maintains the asset hierarchy from the CMMS, P&IDs and documents.
- CriticalityGrades asset criticality and updates it as data changes.
- Damage MechanismScreens damage mechanisms circuit by circuit and keeps the corrosion control document current.
- IOWMonitors integrity operating windows live and escalates by severity.
- SCE AssuranceKeeps safety-critical elements, performance standards and test records current.
Risk and inspection planning
8 agents
- RBIRuns RBI and refreshes it as evidence arrives, explaining each risk driver.
- Inspection PlannerTurns risk into a plan: interval, scope, method and effectiveness.
- Tank IntegrityPlans tank inspections, floor scans and settlement checks.
- Pipeline ThreatAssesses each pipeline threat and identifies high-consequence areas.
- Assessment MethodChooses between in-line inspection, pressure test and direct assessment.
- MAOP VerificationChecks that operating pressure records are traceable, verifiable and complete.
- Relief DevicesSets relief device inspection intervals and keeps the records.
- Turnaround ScopeBuilds the turnaround inspection scope and sequence from the risk picture.
Inspection data and assessment
8 agents
- Inspection DataReads inspection reports in any format, maps them to monitoring points and calculates rates.
- CML OptimizerAdds and removes monitoring points so every reading earns its place.
- ILI AnalystAligns successive in-line inspections, matches features and calculates real growth.
- NDT Signal ReviewPre-screens PAUT, TOFD and guided-wave data for the certified reviewer.
- Anomaly TriageRanks anomalies, sets response times and builds the dig list.
- Visual InspectionReads drone, crawler and field photos to flag corrosion and coating defects.
- Fitness-for-ServiceRuns Level 1 and 2 screening and prepares the full data package for Level 3.
- Remaining LifeProjects remaining life and risk with an uncertainty band.
Action and change
4 agents
- Work OrderSends approved actions to the CMMS and tracks completion.
- Repair StrategyCompares repair options and keeps the temporary repair register.
- DeferralBuilds the risk case for deferring an inspection and routes it for approval.
- Management of ChangeScreens every operating change for its effect on integrity.
Reliability and maintenance
5 agents
- Rotating Equipment HealthReads vibration, temperature and oil data to predict failures.
- Reliability StrategyBuilds maintenance strategies by failure mode and keeps them current.
- Bad ActorsFinds the equipment that fails and costs the most, and why.
- Electrical IntegrityTracks thermography, protection tests and hazardous-area equipment inspections.
- Turnaround ExecutionTracks scope, progress and emergent work during the shutdown.
Production and process
5 agents
- Production LossExplains every lost barrel and ranks the causes.
- Process OptimizationTests setpoint changes on a working copy of the process; operators decide.
- Energy and FlareTracks energy use, flaring and venting, and finds reductions.
- Operator RoundsTurns field rounds into structured, checked readings.
- Alarm ManagementReviews alarms against the philosophy and flags floods and stale alarms.
Structures, subsea and wells
4 agents
- Structural IntegrityPlans and assesses inspections of fixed offshore structures.
- Mooring and RiserManages mooring and riser integrity.
- Subsea IntegrityPlans subsea inspections and reads flowline and equipment data.
- Well IntegrityTracks well barriers and manages annulus pressure.
Containment and emissions
3 agents
- Leak DetectionTriages leak detection alarms and manages the program.
- Methane and LDARTreats every leak as an integrity event and supports methane measurement and reporting.
- Loss of ContainmentClassifies and trends process safety events.
Learning and performance
4 agents
- Incident and RCARuns structured investigations and checks sister assets for the same cause.
- Barrier HealthKeeps bow-tie barriers live against real inspection and test results.
- Integrity KPITracks the AIMS sustain criteria and prepares the management review.
- Knowledge CaptureCaptures the reasoning of senior engineers so it stays when they retire.
