winda Talk to us
Asset strategy software

Asset life cases, valued on engineering data.

Asset managers and portfolio teams use it to turn the asset's full record into a board-ready case for its next chapter.

Winda Helm

Generic asset, for illustration

Today and with Winda

From scattered asset records to 1 board-ready case.

  • Design recordOriginal design dossier
  • Inspection historyWall thickness trend
  • Cost recordMaintenance spend, 5 years
  • Production dataProduction forecast
  • Design recordModification history
  • Inspection historyLast turnaround findings
  • Cost recordReplacement estimate
  • Production dataPlant utilization
Winda HelmWhat the case holds
  1. 01Wall loss outlook, critical vessels and pipingFrom every thickness readingAssessed
  2. 02Replacement scope, rotating equipmentCondition and obsolescence reviewCosted
  3. 03Spend profile, next 10 yearsPhased by turnaroundCosted
  4. 04Production outlook, reservoir and plantAgainst plant capacityForecast
  5. 05Decommissioning liability, wells and facilitiesCost when the plant stopsEstimated

Sample data

  1. 01 TodayLife extension cases built over monthsWith Winda HelmThe case built from the asset's full engineering record
  2. 02 TodayOptions compared on different assumptionsWith Winda HelmEvery option valued on the same life, cost and value basis
  3. 03 TodayHidden liabilities found after a transactionWith Winda HelmIntegrity liabilities found before buying or selling

How it works

Agents prepare. Engines check. The board or investment committee decides.

  1. InThe asset's full record
  2. Agents prepareBuild every option from the full record
    • Life Extension Agent
    • Repurposing Agent
    • Asset Valuation Agent
    • Technical Due Diligence Agent
    • Decommissioning and ARO Agent
  3. Engines checkLife, cost and value on 1 basisAligned to
    • API 579
    • IAS 37
  4. DecidesThe board or investment committee
  5. OutThe case to extend, convert, sell or retire
How the work is controlled
  1. Each agent uses approved tools and this project's data only.
  2. An independent checker agent re-checks the work.
  3. Engineering math comes from validated, deterministic engines.
  4. Every prompt, tool call and output is recorded.
  5. Agents never approve their own work.

See it run

A life extension question, from options to approved case.

Where it fits

Winda Helm takes the remaining life from operations and feeds the board's decision.

Agents

12 agents in 4 teams, aligned to the standards engineers use.

Each team, with the agents in it. Open a team to see what each agent does.

  • Portfolio

    4 agents

    • Portfolio and Capex
    • Scenario Planning
    • Benchmarking
    • Asset Valuation
  • Life decisions

    4 agents

    • Life Extension
    • Repurposing
    • Debottleneck and Expansion
    • Transition Pathway
  • Transactions

    2 agents

    • Technical Due Diligence
    • Sell-Side Data Room
  • End of life

    2 agents

    • Decommissioning and ARO
    • Well P&A Planning