Construction records and handover, checked as built.
QA/QC inspectors and completions engineers use it to turn every weld record, coating check and test pack into released systems, a handover dossier and a day 0 baseline.
Winda Launch
Today and with Winda
From scattered site records to 1 handover dossier.
- Weld recordWeld map, discharge line
- NDT resultRadiography report
- Coating checkFilm thickness readings
- Test packHydrotest pack
- Weld recordWelder qualification
- NDT resultUT report, branch welds
- Coating checkSurface profile check
- Test packLeak test record
Winda LaunchDossier, by section
- 01Weld and NDT register, gas compressionEvery weld traced to a welder and a testComplete
- 02Pressure test packs, produced waterHydrotest and leak test, witnessedComplete
- 03Coating records, discharge pipingSurface preparation and film thicknessComplete
- 04Thickness baseline, inlet manifoldReadings at every monitoring pointRecorded
- 05Outstanding work, utility air package2 items, both clearedClosed
Sample data
- 01 Today
Weld and test records gathered at the end of the jobWith Winda LaunchEvery weld, coating check and test pack proven as it happens - 02 Today
Handover dossiers assembled in the last weeksWith Winda LaunchThe handover record builds itself as systems are released - 03 Today
Operations starts without a baselineWith Winda LaunchOperations starts with a day 0 baseline and a first RBI plan
How it works
Agents prepare. Engines check. Inspectors and the owner release and accept.
- InWeld records, coating checks, test packs
- Agents prepareRead each record and link it to its system
- Weld Traceability Agent
- NDT Results Agent
- Coating QC Agent
- System Completion Agent
- Handover Dossier Agent
- Engines checkEach record against the specificationAligned to
- ASME IX
- API 1104
- ISO 8501-1
- Release and acceptInspectors and the owner
- OutHandover record and baselineReleased systemFuel gas system
- Records
- Welds, tests and coatings checked
- Baseline
- Day 0 wall thickness
- Next step
- Commissioning
How the work is controlled
- Each agent uses approved tools and this project's data only.
- An independent checker agent re-checks the work.
- Engineering math comes from validated, deterministic engines.
- Every prompt, tool call and output is recorded.
- Agents never approve their own work.
See it run
A new test pack, from record check to released system.
Where it fits
Winda Launch takes the vendor data books and feeds operations and integrity.
- DesignEngineering design
- BuildProcurement & bid evaluationVendor data books, from Procurement & bid evaluationConstruction & handoverWinda Launch
- OperateHandover baseline, to Operations & integrityOperations & integrity
- ComplyCompliance & audit
- PlanRisk & insuranceAsset strategy
Agents
24 agents in 4 teams, aligned to the standards engineers use.
Each team, with the agents in it. Open a team to see what each agent does.
Construction QA/QC
8 agents
- Weld TraceabilityChecks weld maps, welder IDs, procedures and qualifications against each other.
- NDT ResultsCollects RT, UT and PAUT reports and checks inspection ratios and repair rates.
- Coating QCChecks surface preparation, film thickness and holiday tests with photo evidence.
- Material ReceivingChecks certificates and verifies materials as they arrive on site.
- Bolted JointsTracks assembly, torque and tensioning records joint by joint.
- ITP and ReleaseTracks hold and witness points and releases inspected work.
- Pressure TestChecks test packs are complete and records every test.
- Field ObservationReads any site photo, spots defects, raises the non-conformance and assigns it.
Site progress and controls
4 agents
- Site ProgressMeasures installed quantities from photos, drone scans and daily reports.
- Daily ReportTurns foreman notes and photos into the daily site report.
- Change Orders and ClaimsLinks every site change to its cost, schedule and contract clause.
- Site HSEChecks permits to work, records toolbox talks and captures incidents.
Completion and commissioning
5 agents
- System CompletionSplits the plant into systems and tracks mechanical completion.
- Punch ListGrades punch items A, B and C and tracks closure evidence.
- Commissioning ProceduresDrafts pre-commissioning and commissioning procedures from the design.
- As-Built ReconciliationCompares the built plant with the design model and records every difference.
- Baseline InspectionRecords baseline thickness at every monitoring point: day zero for every corrosion rate.
Handover and readiness
7 agents
- Handover DossierBuilds the handover record tag by tag, so the owner receives searchable data.
- PSSR EvidenceGathers the evidence for the pre-startup safety review.
- SCE BaselineSets the performance baseline for every safety-critical element.
- IOW SetupSets integrity operating windows from design intent and commissioning data.
- First RBI PlanBuilds the first risk-based inspection plan and loads it into the CMMS.
- CMMS BuildLoads the asset register, maintenance plans and spares into the CMMS.
- Operations ReadinessDrafts operating and emergency procedures and training material from the design.