winda Talk to us
Construction & handover software

Construction records and handover, checked as built.

QA/QC inspectors and completions engineers use it to turn every weld record, coating check and test pack into released systems, a handover dossier and a day 0 baseline.

Winda Launch

Generic asset, for illustration

Today and with Winda

From scattered site records to 1 handover dossier.

  • Weld recordWeld map, discharge line
  • NDT resultRadiography report
  • Coating checkFilm thickness readings
  • Test packHydrotest pack
  • Weld recordWelder qualification
  • NDT resultUT report, branch welds
  • Coating checkSurface profile check
  • Test packLeak test record
Winda LaunchDossier, by section
  1. 01Weld and NDT register, gas compressionEvery weld traced to a welder and a testComplete
  2. 02Pressure test packs, produced waterHydrotest and leak test, witnessedComplete
  3. 03Coating records, discharge pipingSurface preparation and film thicknessComplete
  4. 04Thickness baseline, inlet manifoldReadings at every monitoring pointRecorded
  5. 05Outstanding work, utility air package2 items, both clearedClosed

Sample data

  1. 01 TodayWeld and test records gathered at the end of the jobWith Winda LaunchEvery weld, coating check and test pack proven as it happens
  2. 02 TodayHandover dossiers assembled in the last weeksWith Winda LaunchThe handover record builds itself as systems are released
  3. 03 TodayOperations starts without a baselineWith Winda LaunchOperations starts with a day 0 baseline and a first RBI plan

How it works

Agents prepare. Engines check. Inspectors and the owner release and accept.

  1. InWeld records, coating checks, test packs
  2. Agents prepareRead each record and link it to its system
    • Weld Traceability Agent
    • NDT Results Agent
    • Coating QC Agent
    • System Completion Agent
    • Handover Dossier Agent
  3. Engines checkEach record against the specificationAligned to
    • ASME IX
    • API 1104
    • ISO 8501-1
  4. Release and acceptInspectors and the owner
  5. OutHandover record and baseline
How the work is controlled
  1. Each agent uses approved tools and this project's data only.
  2. An independent checker agent re-checks the work.
  3. Engineering math comes from validated, deterministic engines.
  4. Every prompt, tool call and output is recorded.
  5. Agents never approve their own work.

See it run

A new test pack, from record check to released system.

Agents

24 agents in 4 teams, aligned to the standards engineers use.

Each team, with the agents in it. Open a team to see what each agent does.

  • Construction QA/QC

    8 agents

    • Weld Traceability
    • NDT Results
    • Coating QC
    • Material Receiving
    • Bolted Joints
    • ITP and Release
    • Pressure Test
    • Field Observation
  • Site progress and controls

    4 agents

    • Site Progress
    • Daily Report
    • Change Orders and Claims
    • Site HSE
  • Completion and commissioning

    5 agents

    • System Completion
    • Punch List
    • Commissioning Procedures
    • As-Built Reconciliation
    • Baseline Inspection
  • Handover and readiness

    7 agents

    • Handover Dossier
    • PSSR Evidence
    • SCE Baseline
    • IOW Setup
    • First RBI Plan
    • CMMS Build
    • Operations Readiness